The Resource Conservation and Recovery Act (RCRA) was passed as a law in 1976 and has the following four goals:

  • Protect human health and the environment from the potential hazards of waste disposal.
  • Conserve energy and natural resources.
  • Reduce the amount of waste generated.
  • Ensure that wastes are managed in an environmentally sound manner.

Work on the South River is part of the RCRA Corrective Action Program and is being conducted under the direction of the Virginia Department of Environmental Quality. The documents that have been submitted as part of this program are below.

Remediation Proposal
Download File
[14.44 MB]
Ecological Study Final Report
Download File
[93.36 MB]
RCRA Permit Modification
Download File
[303.76 KB]
Community Involvement Plan
Download File
[303.76 KB]
Phase 1 Interim Measures Work Plan
Download File
[31.36 MB]
Ecological Risk Assessment Report - Volume I
Download File
[56.33 MB]
Ecological Risk Assessment Report - Volume II
Download File
[121.19 MB]
Ecological Risk Assessment Report - Volume III
Download File
[2.08 MB]
Short-Term Monitoring Plan: Revised Habitat Metrics
Download File
[3.85 MB]
RCRA Facility Investigation Report - Volume I
Download File
[20.38 MB]
RCRA Facility Investigation Report - Volume II
Download File
[94.10 MB]
RCRA Facility Investigation Report - Volume III
Download File
[15.28 MB]
Proposed Revision to Long-Term Monitoring Plan: Fish Tissue Sampling and Analysis
Download File
[616.35 KB]
Human Health Risk Assessment Report - Volume I
Download File
[6.56 MB]
Human Health Risk Assessment Report - Volume II
Download File
[57.13 MB]
Human Health Risk Assessment Report - Volume III
Download File
[5.85 MB]
2015 Short-Term Monitoring Field Summary Memorandum
Download File
[4.35 MB]
Short-Term Monitoring Station Location Memorandum
Download File
[4.02 MB]
Phase 1A Bank Management Areas Basis of Design Report - Constitution Park
Download File
[58.81 MB]
2015 Short-Term Monitoring Report
Download File
[16.70 MB]
2016 Short- and Long-Term Monitoring Field Summary Memorandum
Download File
[1.21 MB]
2016 Short-Term Monitoring Report
Download File
[4.98 MB]
Phase 1A Bank Management Areas Basis of Design Report - WWTP
Download File
[64.66 MB]
2017 Spring Short-Term Monitoring Field Summary and Post-Construction Maintenance Memorandum
Download File
[15.99 MB]
Remediation Selection Process
Download File
[5.30 MB]
Long-Term Monitoring Baseline Report
Download File
[23.10 MB]
Fall 2017 Constitution Park Bank Management Area Maintenance Inspection
Download File
[6.92 MB]
Technical Execution Plan: Allied Ready Mix Bank Management Area
Download File
[31.83 MB]
Construction Completion Report: Constitution Park Bank Management Area
Download File
[84.93 MB]
2017 Short-Term Monitoring Report
Download File
[56.03 MB]
Long-Term Monitoring Program Assessment and Recommended Modifications
Download File
[11.10 MB]
Surficial Soils Evaluation Framework
Download File
[10.50 MB]
RCRA Corrective Action Permit Modification
Download File
[4.73 MB]
Long-Term Monitoring Plan
Download File
[17.65 MB]
Construction Completion Report: Wastewater Treatment Plant Bank Management Areas
Download File
[106.59 MB]
AOC 4 Maintenance Plan
Download File
[145.80 KB]
508 W. Main Street
Waynesboro, VA 22908
540-949-5361